Pipeline Content
/
Pipeline Content for UC 海角原创enWATERWORKS: Pipeline Project, Waterway Drawdown
/news/waterworks-pipeline-project-waterway-drawdown
<p><strong>SURFACE WATER PIPELINE:</strong><strong> </strong>A contractor is <a href="/news/water-pipeline-will-soon-reach-campus/">building this line under Howard and Russell fields</a> to deliver a new water supply to the campus. The water will come from the Sacramento River by way of a new treatment plant that also serves Woodland and the city of 海角原创. </p>July 26, 2016 - 3:32pmDave Jones/news/waterworks-pipeline-project-waterway-drawdownWater Pipeline Will Soon Reach Campus
/news/water-pipeline-will-soon-reach-campus
<p>A construction company estimates it will start work Sunday, July 10, at Russell Boulevard and A Street, trenching across Russell to lay the last section of pipe that will deliver a new supply of drinking water to the campus.</p>
<section class="wysiwyg-feature-block ">
<h3 class="wysiwyg-feature-block__title">Online Resources</h3>
<div class="wysiwyg-feature-block__body">
<p><a href="/news/preparing-campuss-new-water-supply">鈥淧reparing for the Campus鈥檚 New Water Supply,鈥�</a> <em>Dateline UC 海角原创</em><br>
(June 7)</p></div></section>June 28, 2016 - 9:30amDave Jones/news/water-pipeline-will-soon-reach-campus